Movement Systems 2025.26

285 All dimensions in millimetres. Subject to changes. Opening system 1 2 3 4 SYNK Synchronisation cable TL Torsion bar length LEGEND INSTALLATION INSTRUCTIONS Cutting frame side to length (for horizontal and vertical wooden stretchers) TL Installation of the drive unit Click Wiring (connection sequence) Front buffer installation 1 2 3 Do not hammer in or glue the front buffer! Installation of the synchronisation cable SYNK SENSOMATIC

RkJQdWJsaXNoZXIy ODM0MzI=